Production Output
Good output, quality and line availability for the selected period.
Daily Output
Good pieces and scrap by day
Line Availability
Daily uptime against the 92% target
Machine Performance
Equipment effectiveness, downtime and capacity utilisation.
Line Availability Trend
Selected period, against 92% target
Downtime by Category
Share of total minutes lost, full month
Capacity Utilisation Reference
Theoretical and realistic output per 8 hour shift by product and cycle time.
| Product | Size (mm) | Cycle (sec) | Pcs / Cycle | Theoretical / Shift | Realistic 80% / Shift | Note |
|---|
Scrap Analysis
Material waste and quality loss for the selected period.
Scrap Rate Trend
Daily scrap rate against the 2.0% target
Scrap by Product Line
Modeled split, pro-rated to each line's share of output
Note on this view. The source production log records total daily scrap but does not break scrap down by product line or cause. The product-line split and scrap cost shown here are modeled: scrap is allocated across products in proportion to their share of good output, and cost uses the average variable cost per piece from the P&L. Treat these two figures as estimates, not machine-logged values.
Financial Snapshot
Monthly profit and loss in Omani Rial, derived from output and unit economics.
Total Revenue
Variable Costs
Gross Profit
Gross Margin
Fixed Costs
EBITDA
Revenue / Piece
Revenue by Product Line
Contribution of each product to the 569,059 OMR monthly total.
| Product Line | Good Pieces | Unit Price (OMR) | Revenue (OMR) | Share | Contribution |
|---|
Business Plan Targets
Feasibility study benchmarks against actual June performance.
Business Plan Targets, Feasibility Study
Key Assumptions & Targets
- Operating days per month
- 30
- OEE target
- 85%
- Scrap target
- 2.0%
- Availability target
- 92%
- Energy target
- 4.5 kWh/1k
- Cement per block target
- 0.230 kg
- Cement price
- 0.060 OMR/kg
- Electricity tariff
- 0.025 OMR/kWh
Energy & Materials
Consumption and intensity for the selected period.
Energy Intensity
kWh per 1,000 good pieces against the 4.5 target
Material Mix, Full Month
Cement, sand and aggregate consumed