Precast Operations  /  Oman Proof of Concept

Block & Interlock FactoryMonthly Operations Dashboard v1.5

June 2026|30 operating days|8 hour shift|OMR
Period
A

Production Output

Good output, quality and line availability for the selected period.

Live for selected period

Daily Output

Good pieces and scrap by day

Good piecesScrap pieces

Line Availability

Daily uptime against the 92% target

AvailabilityTarget 92%
B

Machine Performance

Equipment effectiveness, downtime and capacity utilisation.

Full month reference

Line Availability Trend

Selected period, against 92% target

Downtime by Category

Share of total minutes lost, full month

G

Capacity Utilisation Reference

Theoretical and realistic output per 8 hour shift by product and cycle time.

Static reference, not period-filtered
ProductSize (mm)Cycle (sec)Pcs / CycleTheoretical / ShiftRealistic 80% / ShiftNote
C

Scrap Analysis

Material waste and quality loss for the selected period.

Live for selected period

Scrap Rate Trend

Daily scrap rate against the 2.0% target

Scrap rateTarget 2.0%

Scrap by Product Line

Modeled split, pro-rated to each line's share of output

Note on this view. The source production log records total daily scrap but does not break scrap down by product line or cause. The product-line split and scrap cost shown here are modeled: scrap is allocated across products in proportion to their share of good output, and cost uses the average variable cost per piece from the P&L. Treat these two figures as estimates, not machine-logged values.

D

Financial Snapshot

Monthly profit and loss in Omani Rial, derived from output and unit economics.

Full month reference

Total Revenue

569,059OMR
From product P&L

Variable Costs

35,139OMR
Materials + energy

Gross Profit

533,920OMR
Revenue less variable

Gross Margin

93.8%
Strong

Fixed Costs

3,200OMR
Labour, overhead, depr.

EBITDA

530,720OMR
Operating earnings

Revenue / Piece

0.0910OMR
Per good piece
F

Revenue by Product Line

Contribution of each product to the 569,059 OMR monthly total.

Full month reference
Product LineGood PiecesUnit Price (OMR)Revenue (OMR)ShareContribution
H

Business Plan Targets

Feasibility study benchmarks against actual June performance.

Business Plan Targets, Feasibility Study

Hollow Block
100,000 pcs / month
13,000 OMR
Interlock
16,000 m² / month
35,200 OMR
Combined Revenue Target
Feasibility baseline
48,200 OMR
Actual Revenue, June
From product P&L
569,059 OMR
Gap vs Target
Above feasibility baseline
+520,859 OMR

Key Assumptions & Targets

Operating days per month
30
OEE target
85%
Scrap target
2.0%
Availability target
92%
Energy target
4.5 kWh/1k
Cement per block target
0.230 kg
Cement price
0.060 OMR/kg
Electricity tariff
0.025 OMR/kWh
E

Energy & Materials

Consumption and intensity for the selected period.

Live for selected period

Energy Intensity

kWh per 1,000 good pieces against the 4.5 target

kWh / 1,000 pcsTarget 4.5

Material Mix, Full Month

Cement, sand and aggregate consumed